Photos of the pouring.
The pumper truck. There were quite a few guys here for this job.
One of the guys from the pumper truck directs the concrete.
The pumper truck is radio controlled (that is the device the guy on the right is wearing).
First, they filled the hole for the roof support.
Then they put in the floor in the hallway.
One of the crew shook the mud to distribute the rocks.
After the shaking comes the smoothing.
Pics of the finished floor tomorrow.
No comments:
Post a Comment