It's been a while since I posted.
The wallboard arrived last week:
The guy in the foreground with the hard hat has a remote control to manage the crane device.
They bring a load of wallboard to the house, then pull it off the lift and onto a dolly, then wheel it to the dropping point with the dolly After that, Jake could nail the window in permanently and finish the siding on the outside of the house.
Then a crew came and nailed up wallboard for a couple of days. They put the sheets in place, then cut out openings as needed.
Before they start the taping, they put down paper on the floor -- easier than scraping the mud off.
I'm also working on paint colors and flooring. I should get samples that I can take pictures of and post soon.
No comments:
Post a Comment